|
|
The construction of lacquer spraying several times? - stone / Stone manufacturers offer |
In the lacquer construction process, forming a good and said good secondary molding, in which there is no national standard, is actually a good or two? According to the summary of our engineering department for many years, the lacquer construction practice, we can responsibly say lacquer construction two molding to better than a molding, which in the end fortunately please listen to me carefully. A, a molding of the coating thickness is not easy to grasp, especially is more likely to cause defects on hand for the new jet construction; Two, a molding can not overcome the construction defects, but the two molding can be aimed at the problem of the former process to take to save the construction. Some of this defect is caused by the wall, some is caused by the coating formulation, from the formula about to overcome the shortcoming of the formula is very easy, says matter of factly defect recipe mostly caused by the owner's designated color, because, sometimes, to get the color alignment is necessary to maintain the defect recipe, however, construction personnel may do not understand these, if once formed, then trouble came, so forming the second can the construction risk to the firewall. , a molding because the paint volume is too big to spray out often is not flat, lacquer thinner slightly mistake will flow to hang. Secondary forming the paint quantity is less, the fan good atomization effect is easy to control, the spray is very smooth, slightly polished feel a lot better. Four, a molding can reduce the construction risk, reduce the cost. Sometimes construction is dependent on the weather, especially in the south of the rainy season, if the wall did, or rain, in rush period situation may barely operating, if it is a shape that the loss of white paint the, if first thin spray a dry paint surface not white didn't what big problem, if there is a little white, postpone the time limit for a project the second construction can also put it covers. Even if the tight schedule must be construction, what is dry before a lacquer for subsequent water will play to block, for secondary construction paint dry for the time, paint dry after the water to leak out nor white; Fifth, the intuition of a lot of people think paint a large quantity of secondary construction consumption, theoretical basis is the second construction two play in hardware wall rebound landing powder. But according to our experience, a construction and two times the amount of paint consumption almost. Because once the construction thickness is not easy to master often to be sprayed with a thick (as Jerry intentionally gushing is not Yo), secondary construction good atomization effect, accurate with the amount of paint, and then to consider the second construction to bring other benefits cost actually want to save a lot of. Six, according to our construction experience, for yellow, red, orange, coffee color this color, especially two times, otherwise it is easy to spend; Seven, do not listen to a molding construction staff boast with you how good it can work less money, who is not happy!? You as long as we stick to the secondary molding, something all right to supervise, honestly that he would get the job done, to build a house is vital, not sloppy. The above is the company in recent years various construction experience, we hope to help. |
|
|